Sign In | Join Free | My chinaqualitycrafts.com
China Daoyunai Energy Saving Technology Limited logo
Daoyunai Energy Saving Technology Limited
Committed to underground pipeline CIPP and CCTV
Verified Supplier

4 Years

Home > UV Cured CIPP >

Cured-In-Place-Pipe UV CIPP Lining Companies City Pipe Repair Without Digging

Daoyunai Energy Saving Technology Limited
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Cured-In-Place-Pipe UV CIPP Lining Companies City Pipe Repair Without Digging

  • 1
  • 2
  • 3

Brand Name : DAO

Model Number : D919

Place of Origin : Jiangsu, China

MOQ : 1 unit

Price : Variable

Payment Terms : T/T

Supply Ability : 20 units per month

Delivery Time : 25 working days

Packaging Details : Normal

Purpose : City pipe repair

Composition : Two Blowers, Cable, Video, Cure

Cable reel : 190 meters

Light : High voltage mercury

Diameter : DN300-1500

Color : Blank or printed as required

Contact Now

UV CIPP (Cured-In-Place-Pipe) manufactured for city pipe repair without digging

Regulations on fixing the bottom film:

The width of the bottom membrane shall be greater than 1/3 of the circumference of the original pipeline, and the length is recommended to be 500mm longer than the original pipeline. If it can be extended to the ground, it is better. The backing membrane shall not be broken and accumulated during the pulling process.

After the bottom membrane is pulled to the end, it shall be fixed firmly with a wooden square and other items and shall be fixed at the opposite nozzle as far as possible to reserve enough space for the following operations.

Drag liner material: the material head is locked:

Before the materials are taken out of the wooden box, a cloth about 3M wide and 7-8m long shall be laid on the ground in advance to protect the materials. Place the material on the cloth when taking it out.

1. The material shall be horizontally folded in half to an appropriate width, about one-third, and then vertically folded in half by 50 cm (the length of the longitudinal folding can be adjusted appropriately according to the site conditions).

2. Fold the lifting belt in the middle, and wrap the folded material head with a rope tightener until it cannot fall off (the metal buckle is placed in the middle of the upper part).

And wrap it with adhesive tape.

Finally, link the material pulling rope with the lifting belt with shackles and lock it firmly. If the material is long or large, a universal shaft needs to be added in the middle. (universal shaft must be added when dragging materials with steel wire rope.)

Bottom film 1/3 of the pipe size for protecting
Liner head Locked
Key points slowly and carefully

Cured-In-Place-Pipe UV CIPP Lining Companies City Pipe Repair Without Digging


Product Tags:

Cured-In-Place-Pipe Uv Cipp Lining

      

DAO Uv Cipp Linings Companies

      

cured-in-place-pipe cipp lining

      
Quality Cured-In-Place-Pipe UV CIPP Lining Companies City Pipe Repair Without Digging for sale

Cured-In-Place-Pipe UV CIPP Lining Companies City Pipe Repair Without Digging Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Daoyunai Energy Saving Technology Limited
*Subject:
*Message:
Characters Remaining: (0/3000)